Standard Building Sub-Contract Conditions (SBCSub/C)
JCT 05
- Author:
- Joint Contracts Tribunal (JCT) [?ProductPublisher:?]
Appropriate:
-
for use where the main contract is the Standard Building Contract (with quantities, without quantities or with approximate quantities);
-
for sub-contract works where the Sub-Contractor is not required to design.
Can be used:
-
where the sub-contract works and/or main contract works are to be carried out in sections;
-
for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement.
Not suitable:
-
where the Sub-Contractor is to design any part of the sub-contract works, even though the other criteria are met - consider the Standard Building Sub-Contract with sub-contractor's design (SBCSub/D/A and SBCSubD/C).
Extent | N/A | Sub. No. | |
---|---|---|---|
Size | A4 | Price | [?DiscountedPrice:?] |
Format | Paperback | ||
Availability | [?AvailabilityAlt:?] | Delivery | Delivery options and charges |