Standard Building Sub-Contract Conditions (SBCSub/C)

JCT 05

Author:
Joint Contracts Tribunal (JCT)
[?ProductPublisher:?]
Price: [?DiscountedPrice:?]

Appropriate:

  • for use where the main contract is the Standard Building Contract (with quantities, without quantities or with approximate quantities);

  • for sub-contract works where the Sub-Contractor is not required to design.

Can be used:

  • where the sub-contract works and/or main contract works are to be carried out in sections;

  • for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement.

Not suitable:

  • where the Sub-Contractor is to design any part of the sub-contract works, even though the other criteria are met - consider the Standard Building Sub-Contract with sub-contractor's design (SBCSub/D/A and SBCSubD/C).

Extent N/A Sub. No.
Size A4 Price [?DiscountedPrice:?]
Format Paperback    
Availability [?AvailabilityAlt:?] Delivery Delivery options and charges